Project Details
- Location: East Baton Rouge Parish, LA
- Status: Producing (~60–80 BOPD)
- Scope: 3 producing wells + 2 utility wells (2 recompletions)
- Included: Equipment & leasehold interests
- Interests: 100% WI / 75% NRI
- Acreage: ~360 net acres (HBP)
Project Specification
Operated producing package focused on production optimization through re-completions and seismic-guided step-outs and use of SRM-MBS Technology.
Target: Wilcox Oil Formation; Seismic: Proprietary 2-D / 3-D interpretation. Facilities: On-lease equipment included
Site Footage
Project Description
Port Hudson Project I is an operated producing asset in East Baton Rouge Parish with three producing wells and two utility wells. The package includes on-lease equipment and leasehold interests. Near-term value will be driven by production optimization and selective workovers; medium-term upside is expected from seismic-guided step-outs prioritized using G&GE’s proprietary 2-D/3-D interpretation and SRM-MBS pre-drill focusing to reduce dry-hole risk and accelerate cash flow. Additional behind pipe reserves . Excellent candidate for secondary recovery once primary production is completed