Project Details

  • Location: East Baton Rouge Parish, LA
  • Status: Producing (~60–80 BOPD)
  • Scope: 3 producing wells + 2 utility wells (2 recompletions)
  • Included: Equipment & leasehold interests
  • Interests: 100% WI / 75% NRI
  • Acreage: ~360 net acres (HBP)

Project Specification

Operated producing package focused on production optimization through re-completions and seismic-guided step-outs and use of SRM-MBS Technology.

Target: Wilcox Oil Formation; Seismic: Proprietary 2-D / 3-D interpretation. Facilities: On-lease equipment included

Site Footage

Project Description

Port Hudson Project I is an operated producing asset in East Baton Rouge Parish with three producing wells and two utility wells. The package includes on-lease equipment and leasehold interests. Near-term value will be driven by production optimization and selective workovers; medium-term upside is expected from seismic-guided step-outs prioritized using G&GE’s proprietary 2-D/3-D interpretation and SRM-MBS pre-drill focusing to reduce dry-hole risk and accelerate cash flow. Additional behind pipe reserves . Excellent candidate for secondary recovery once primary production is completed